Semi Mobile System
The DC 5900/5800c can be docked to a temporary or permanent tubing system installed in the work area. With a branch pipe package like below (item 3353), a temporary pipeline can be built in a stairwell or in a shakt. Several branch pipe packages can be connected in series or in branches.
This picture shows the concept of the system.
United Kingdom
Sverige
Deutschland
Suomi
Austria
United States
.com
France 
01327 858002
